2022-2322-06-2022Receipt of Rs. 308 Crore as part payment towards Arbitral Award relating to IRB Pathankot Amritsar Toll Road Ltd – June 22, 2022Download
 16-06-2022Update regarding Financial Closure achieved by Meerut Budaun Expressway Limited– June 16, 2022Download
 10-06-2022Update - Toll Revenue for May 2022 and April 2022 (Reg 30 of SEBI LODR) - June 10, 2022Download
 06-06-2022Preliminary non-binding proposal for transfer of the Vadodara Kim Expressway Project to the IRB InvIT Fund – June 06, 2022Download
 01-06-2022Disclosure on Related Party Transactions for the half year ended March 31, 2022Download
 23-05-2022Transcript for the Earnings Call held on May 18,2022Download
 23-05-2022Annual Secretarial Compliance Report – May 23, 2022Download
 20-05-2022Update regarding Appointed date for Pathankot Mandi Highway Private Limited – May 20, 2022Download
 18-05-2022Update regarding Financial Closure achieved by Chittoor Thachur Highway Private Limited – May 18, 2022Download
 17-05-2022Update on Advisory Services Agreements - May 17, 2022Download
 17-05-2022Statement on Deviation or Variation of funds raised through preferential issue – May 17, 2022Download
 17-05-2022Outcome of Board Meeting held on May 17, 2022Download
 16-05-2022Intimation of Earnings Call to be held on May 18, 2022 – May 13, 2022Download
 10-05-2022Intimation of Board Meeting to be held on May 17, 2022Download
 05-05-2022Proceedings and Voting Results of Postal BallotDownload
 05-05-2022Scrutinizer's Report for Postal BallotDownload
 22-04-2022Update regarding IRB Infrastructure Trust – April 21, 2022Download
 15-04-2022Update - Toll Revenue for March 2022 and February 2022 (Reg 30 of SEBI LODR) - April 15, 2022Download
 04-04-2022Issue of Provisional Certificate for VK1 Expressway Private Limited – April 4, 2022Download
 04-04-2022Update regarding Appointed date for Palsit Dankuni Tollway Private Limited - April 4, 2022Download
2021-2230-03-2022Trading Window closure – March 30, 2022Download
 29-03-2022Outcome of Board Meeting held on March 29, 2022Download
 28-03-2022Analyst/Investor meeting /interactions – March 28, 2022Download
 22-03-2022Update - Toll Revenue for January 2022 and February 2022 (Reg 30 of SEBI LODR) - March 22, 2022Download
 10-03-2022Update on Arbitration proceedings relating to IRB Goa Tollway Pvt. Ltd ("IRBGT")Download
 10-03-2022Update on Arbitration proceedings relating to the CompanyDownload
 28-02-2022Update - Project implemented by IRB Westcoast Tollway Limited – February 28, 2022Download
 25-02-2022Investor Conference – 25.02.2022Download
 12-02-2022Intimation of Credit rating – February 12, 2022Download
 10-02-2022Change in Directorate – February 10, 2022Download
 10-02-2022Statement on Deviation or Variation of funds raised through preferential issue – February 10, 2022Download
 10-02-2022Outcome of Board Meeting held on February 10, 2022Download
 09-02-2022Intimation of Earnings Call to be held on February 11, 2022 – February 9, 2022Download
 04-02-2022Intimation of Board Meeting to be held on February 10, 2022Download
 10-01-2022Update Regarding Financial Closure achieved by Palsit Dankuni Tollway Private Limited – January 10, 2022Download
 06-01-2022Update - Ganga Expressway (Group - I) – January 06, 2022Download
 30-12-2021Trading Window Closure- December 30, 2021Download
 29-12-2021Resignation of Joint Managing Directors', Appointment of Directors and change in terms of directorship-December 29, 2021Download
 29-12-2021Alteration of Articles of Association of the Company-December 29, 2021Download
 29-12-2021Alteration of the terms or structure of any existing securities i.e. Non-Convertible Debentures (Ncds)-December 29,2021Download
 29-12-2021Outcome of Allotment of Equity Shares by way of preferential allotment on a private placement basis-December 29, 2021Download
 22-12-2021Approval of Terms of advisory service agreement – December 22, 2021Download
 21-12-2021Update – Execution of Concession Agreement – 21.12.2021Download
 17-12-2021Receipt of Letter of Award – December 17, 2021Download
 16-12-2021Update on Re-commencement of Toll Collection of Kaithal Tollway Limited – December 16, 2021Download
 10-12-2021Intimation of Financial Closure of Pathankot Mandi Highway Private Limited – December 10, 2021Download
 01-12-2021Analyst/Investor meeting /interactions – December 1, 2021Download
 30-11-2021Trading Window Closure - November 30, 2021Download
 30-11-2021Execution of Share Subscription Agreement - Bricklayers Investment Pte. Ltd. ('GIC') - November 30, 2021Download
 29-11-2021Execution of Investment Agreement - Cintra INR Investments BV - November 29, 2021Download
 21-11-2021Scrutinizer's Report for AGM held on November 20, 2021Download
 20-11-2021Proceedings of Extra Ordinary General Meeting – 20.11.2021Download
 02-11-2021Disclosure on Related Party Transactions on a consolidated basis for the half year ended September 30, 2021Download
 30-10-2021Statutory Auditors Certificate(s) Reg. 163(2) of SEBI (ICDR) Regulations, 2018 – October 30, 2021Download
 26-10-2021Outcome of Board Meeting held on October 26, 2021Download
 25-10-2021Intimation of Earnings Call – October 25, 2021Download
 21-10-2021Update on Board Meeting to be held on October 26, 2021Download
 20-10-2021Intimation of Board Meeting to be held on October 26, 2021Download
 09-10-2021Update : Pune-Nashik BOT Project – 9th October, 2021Download
 30-09-2021Allotment of Listed Non-Convertible Debentures on private placement basis – September 30, 2021Download
 30-09-2021Scrutinizer's Report for AGM held on September 30, 2021Download
 30-09-2021Proceedings of 23rd Annual General MeetingDownload
 29-09-2021Trading Window Closure September 29, 2021Download
 27-09-2021Update- Receipt of Letter of Award (LoA) – September 25, 2021Download
 23-09-2021Analyst/Investor meeting /interactions –September 23, 2021Download
 18-09-2021Update on IRB Sindhudurg Airport Private Limited – September 18, 2021Download
 03-09-2021Intimation of Annual General Meeting of the Company – September 03, 2021Download
 02-09-2021Update - Preferred Bidder For Chittoor - Thachur Six Laning Highway Hybrid Annuity Project In Tamil Nadu – September 2, 2021Download
 15-08-2021Completion Certificate for project implemented by CG Tollway Limited – August 15, 2021Download
 10-08-2021Outcome of Board Meeting held on August 10, 2021Download
 10-08-2021Revised Intimation of Earnings Call – August 09, 2021Download
 09-08-2021Intimation of Earnings Call – August 09, 2021Download
 04-08-2021Intimation of Board Meeting to be held on August 10, 2021Download
 29-07-2021Updated Corporate Presentation - Q4FY21 – July 29, 2021Download
 27-07-2021Regulation 30 of LODR – Press Release – July 27, 2021Download
 26-07-2021Update regarding IRB Infrastructure Trust – Private InvIT – July 26, 2021Download
 21-07-2021Intimation of affirmation in Rating –July 21, 2021Download
 15-07-2021Update on Arbitration proceedings relating to the Company – July 15, 2021Download
 30-06-2021Trading Window Closure June 29, 2021Download
 16-06-2021Analyst/Investor meeting /interactions – June 16, 2021Download
 15-06-2021Update – Execution of Concession Agreement – 14.06.2021Download
 31-05-2021Completion Certificate for Udaipur BOT Project – May 31, 2021Download
 28-05-2021Secretarial compliance report – May 27, 2021Download
 27-05-2021Outcome of Board Meeting held on May 27, 2021Download
 26-05-2021Intimation of Earnings Call – May 28, 2021Download
 24-05-2021Investor Meet May 24, 2021Download
 20-05-2021Intimation of Board Meeting to be held on May 27, 2021Download
 30-04-2021Investor Meet April 30, 2021Download
 08-04-2021Intimation of Credit Ratings- April 08, 2021Download
 01-04-2021Update- Receipt of Letter of Award (LoA) - April 01, 2021Download
 01-04-2021Trading Window Closure March 31, 2021Download
2020-2130-03-2021Update - Addition of two new PPP projects – March 30, 2021Download
 26-03-2021Update – Re-organisation of the Management Team March 26, 2021Download
 24-02-2021Update - Thane Ghodbunder BOT Project – 24.02.2021Download
 22-02-2021Allotment of Unlisted Non-Convertible Debentures on a private placement basis – February 22, 2021Download
 18-02-2021Investor Meet February 18, 2021Download
 10-02-2021Intimation under Reg 30 of SEBI LODR – February 10, 2021Download
 09-02-2021Outcome of Board Meeting held on February 9, 2021Download
 04-02-2021Intimation of Board Meeting to be held on February 9, 2021Download
 01-02-2021Disclosure regarding Condensed Financial Statements of Private InvIT¬¬_January 31, 2021Download
 30-01-2021Update Extention - Thane Ghodbunder BOT Project – 30.01.2021Download
 26-01-2021Condensed Financial Statements of the Company– January 25, 2021Download
 18-01-2021Outcome of Board Meeting held on January 18, 2021Download
 18-01-2021Re-appointment of Whole-Time Director – January 18, 2021Download
 18-01-2021Update Regarding Financial Closure Achieved By VM7 Expressway Private Limited – January 18, 2021Download
 15-01-2021Intimation of Earnings Call – January 19, 2021Download
 12-01-2021Intimation of Board Meeting to be held on January 18 2021Download
 04-01-2021Clarification relating to a news article appeared in the Economic Times January 4, 2021 edition under headline β€œLenders receive far fewer loan recast requests than anticipatedDownload
 31-12-2020Update Extention - Thane Ghodbunder BOT Project – 31.12.2020Download
 30-12-2020Press release regarding Financial Closure Of IRB MP Expressway Pvt. Ltd. June 18, 2020Download
 30-12-2020Trading Window Closure December 30, 2020Download
 24-12-2020Company's update regarding current watchlist – December 23, 2020Download
 11-12-2020Disclosure on Related Party Transactions on a consolidated basis for the half year ended September 30, 2020Download
 08-12-2020Intimation of Credit Ratings- December 08, 2020Download
 24-11-2020Completion Certificate for Agra Etawah Bypass BOT Project – November 24, 2020Download
 19-11-2020Investor Meet November 18, 2020Download
 18-11-2020Update – November 17, 2020Download
 12-11-2020Outcome of Board Meeting held on November 12, 2020Download
 10-11-2020Intimation of Earnings Call - November 13, 2020Download
 06-11-2020Intimation of Board Meeting to be held on November 12 2020Download
 30-09-2020Intimation of Record date and Interest payment date of NCDs September 30, 2020.Download
 30-09-2020Trading Window Closure 29.09.2020Download
 29-09-2020Intimation of payment of Interest of NCDs September 29, 2020Download
 25-09-2020Investor Meet– September 25, 2020Download
 25-09-2020Issue of Completion Certificate for Yedeshi Aurangabad BOT ProjectDownload
 21-09-2020Intimation of Record date and Interest payment date of NCDs September 21, 2020Download
 17-09-2020Intimation of Record date and Interest payment date of NCDs September 17, 2020Download
 16-09-2020Update – September 15, 2020Download
 15-09-2020Intimation of payment of Interest of NCDs September 15, 2020Download
 29-08-2020Intimation of payment of Interest of NCDs August 29, 2020Download
 29-08-2020Intimation of credit rating(s) - 28.08.2020Download
 24-08-2020Outcome of Board Meeting held on August 24, 2020Download
 19-08-2020Update - August 18, 2020Download
 19-08-2020Intimation of Board Meeting to be held on August 24 2020Download
 17-08-2020Intimation of Record date and Interest payment date of NCDs August 17, 2020Download
 14-08-2020Intimation of payment of Interest of NCDs August 14, 2020Download
 03-08-2020Update on Hybrid Annuity Project August 02, 2020Download
 03-08-2020Intimation of Record date and Interest payment date of NCDs August 02, 2020Download
 31-07-2020Company emerged as a preferred bidder for Hybrid Annuity Project – 29.07.2020Download
 30-07-2020Intimation of payment of Interest of NCDs July 29, 2020Download
 29-07-2020Proceedings of 22nd Annual General MeetingDownload
 22-07-2020Investor Meet July 21 2020Download
 21-07-2020Update - 21.07.2020Download
 20-07-2020Investor Meet July 20 2020Download
 17-07-2020Allotment of Secured, Redeemable, Listed, Rated Non-Convertible Debentures on a private placement basis- July 17 2020Download
 17-07-2020Change in Key Managerial Personnel – July 17 2020Download
 16-07-2020Intimation of payment of Interest of NCDs July 16, 2020Download
 16-07-2020Disclosure on Related Party Transactions on a consolidated basis for the half year ended March 31, 2020Download
 14-07-2020Investor Meet- July 13 2020Download
 10-07-2020Update on Preferred Bidder for the Project of β€œ6 Laning of National Corridor NH-19 from Palsit to Dankuni”-10.07.2020Download
 10-07-2020Intimation of Record date and Interest payment date of NCDs July 10 2020Download
 09-07-2020Allotment of Secured, Redeemable, Listed, Rated, Non-Convertible Debentures on a private placement basis – July 08 2020Download
 07-07-2020Corrigendum - Audited Financial Results for the quarter and year ended March 31, 2020 - July 06, 2020Download
 03-07-2020Allotment of Secured, Redeemable, Listed, Rated, Non-Convertible Debentures on a private placement basis – July 02 2020Download
 29-06-2020Allotment of Secured, Redeemable, Listed, Rated, Non-Convertible Debentures on a private placement basis – June 29 2020Download
 29-06-2020Intimation of Record date and Interest payment date of NCDs - June 29 2020Download
 22-06-2020Amendment to Outcome of the Meeting of the Board of Directors held on June 18, 2020Download
 18-06-2020Outcome of Board Meeting held on June 18, 2020Download
 16-06-2020Allotment of Redeemable, Secured, Unlisted, Unrated, Non-Convertible Debentures on a private placement basis – June 16 2020Download
 15-06-2020Intimation of Board Meeting to be held on June 18 2020Download
 15-06-2020Allotment of Secured Redeemable Listed Rated Non Convertible Debentures on a private placement basis – June 15 2020Download
 21-05-2020Allotment of Secured, Redeemable, Listed, Rated Non-Convertible Debentures on a private placement basis– May 21, 2020Download
 26-04-2020Outcome of Board Meeting held on April 26 2020.Download
 26-04-2020Press release regarding IRB Infrastructure Developers Limited Board approves fund raising of up to Rs.2,500 Crores - April 26, 2020Download
 24-04-2020Reschedule of Board Meeting to be held on April 25, 2020 to April 26, 2020Download
 24-04-2020Resumption of Toll Collection- April 20, 2020Download
 24-04-2020Intimation of Board Meeting to be held on April 25 2020Download
2019-2026-03-2020Toll plaza operation in view of COVID -19 epidemic – March 26, 2020Download
 03-03-2020Redemption of Non-Convertible Debentures issued by the Company – March 3, 2020Download
 02-03-2020Update Mumbai Pune Project – February 25 2020Download
 27-02-2020Allotment of Units by IRB Infrastructure Trust " – February 26, 2020Download
 25-02-2020Update – Mumbai-Pune ProjectDownload
 25-02-2020Press release regarding receipt of investment proceeds by IRB Infrastructure Trust – February 25, 2020Download
 14-02-2020Outcome of Board Meeting held on February 14, 2020Download
 12-02-2020Issue of Provisional Completion Certificate For The Project Implemented By IRB Westcoast Tollway Limited – February 12, 2020Download
 11-02-2020Cessation of Chief Executive Officer Mr Dhananjay K Joshi – February 11, 2020Download
 07-02-2020Intimation of Board Meeting to be held on February 14, 2020Download
 28-01-2020Re appointment of Independent Director – Mr Sandeep Shah – January 28, 2020Download
 05-01-2020Receipt of No Objection Certificate NOC from National Highway Authority of India NHAI for transfer of Nine BOT SPVs to IRB Infrastructure Trust – January 05, 2020Download
 31-12-2019Trading Window Closure 31.12.2019Download
 17-12-2019Investor Meet - 17.12.2019Download
 17-12-2019Outcome of the Management Administration and Share Transfer Committee Meeting held on December 16, 2019Download
 04-12-2019Intimation of Board Meeting to be held on December 6, 2019Download
 26-11-2019Grant of Registration Certificate - IRB Infrastructure TrustDownload
 26-11-2019Outcome of Board Meeting held on December 6, 2019Download
 22-11-2019Disclosure on Related Party Transactions on a consolidated basis for the half year ended 30th September, 2019.Download
 02-11-2019Deemed Termination of Concession Agreements of IRB PP Project Private Limited and IRB PS Highway Private Limited – November 2, 2019Download
 16-10-2019Investor Meet 16.10.2019Download
 16-10-2019Investor Meet 15.10.2019Download
 15-10-2019Intimation of Board Meeting to be held on October 23 2019Download
 07-10-2019Investor Meet – 04.10.2019Download
 30-09-2019Trading Window Closure 30.09.2019Download
 26-09-2019Proceedings of 21st Annual General MeetingDownload
 20-09-2019Investor Meet – 20.09.2019Download
 17-09-2019Investor Meet – 16.09.2019Download
 30-08-2019Investor Meet – 30.08.2019Download
 12-08-2019Update regarding Mumbai Pune Project – August 12 2019Download
 06-08-2019GIC Investment in IRBDownload
 06-08-2019Corporate Presentation June 2019Download
 29-07-2019Rescheduling of Board Meeting on August 6, 2019Download
 26-07-2019Intimation of Board Meeting to be held on August 2, 2019Download
 30-06-2019Closure of Trading Window – June 29, 2019Download
 27-06-2019Disclosure on Related Party Transactions on a consolidated basis for the half year ended 31st March, 2019Download
 29-05-2019Receipt of Work Orders for Operation & Maintenance (O&M) – May 28, 2019Download
 29-05-2019Update regarding Appointed date for Hapur Moradabad Project – May 28, 2019Download
 22-05-2019Intimation of Board Meeting to be held on May 28, 2019Download
 15-05-2019Intimation of Schedule of Concall with Analysts / Institutional Investors on May 15, 2019.Download
 15-05-2019Intimation of Schedule of Concall with Analysts / Institutional Investors on May 8, 2019.Download
 09-04-2019Intimation of Schedule of Concall with Analysts / Institutional Investors on April 10, 2019.Download
 01-04-2019Adoption of amended Code of Conduct under SEBI (PIT) Reg., 2015 – 01.04.2019Download
 01-04-2019Appointment of Woman Independent Director – 30.03.2019Download
2018-1930-03-2019Trading Window Closure – 30/03/2019Download
 18-03-2019Issue of Provisional Certificate for Yedeshi Aurangabad BOT Project : 17.03.2019Download
 12-03-2019Update regarding Pune Solapur Project 12.03.2019Download
 02-03-2019Update regarding Hyderabad Outer Ring Road Project 02.03.2019Download
 28-01-2019Intimation of Board Meeting to be held on February 4, 2019Download
 18-01-2019Update regarding Appointed date for VK1 Expressway Private Limited -18.01.2019Download
 26-11-2018India Ratings and Research (Ind- Ra) revised IRB’s Outlook to Positive from Stable - 26.11.2018Download
 23-10-2018Intimation of Board Meeting to be held on October 30, 2018Download
 19-10-2018Update regarding Financial Closure achieved by VK1 Expressway Private Limited – 18.09.2018Download
 04-10-2018Crisil Initiates Credit Rating of The Company with Positive Outlook – 02.10.2018Download
 01-10-2018Update regarding Financial Closure achieved by IRB PS Highway Private Limited – 29.09.2018Download
 01-10-2018Update regarding Financial Closure achieved by IRB PP Project Private Limited – 27.09.2018Download
 01-09-2018Proceedings of 20th Annual General MeetingDownload
 20-07-2018Intimation of Board Meeting to be held on July 25, 2018Download
 31-05-2018Update regarding Hapur Moradabad Project with respect to execution of Concession Agreement – May 29, 2018Download
 24-05-2018Letter of Award from Hyderabad Growth Corridor LimitedDownload
 16-05-2018Update regarding execution of Concession Agreement for two Hybrid Annuity Projects – May 16, 2018Download
 11-05-2018Update regarding execution of Concession Agreement – May 10, 2018Download
 27-04-2018Intimation of Board Meeting to be held on May 3, 2018Download
 18-04-2018Update on Closure report filed by the CBI – April 18, 2018Download
 18-04-2018Open Letter to All Stakeholders from Shri Virendra D. Mhaiskar, Chairman & Managing DirectorDownload
2017-1822-03-2018Preferred bidder for the project of Six Laning of Hapur bypass to Moradabad sectionDownload
 22-03-2018Letter of Award for the Hybrid Annuity Project under NHDP Phase VI in the state of GujaratDownload
 19-03-2018Preferred Bidder for a Hybrid Annuity Project under NHDP Phase VI in the state of GujaratDownload
 16-03-2018Letter of Award for two Hybrid Annuity ProjectsDownload
 15-03-2018Issue of Provisional Certificate for Solapur – Yedeshi BOT ProjectDownload
 15-03-2018Selected as a preferred bidder for two Hybrid Annuity ProjectsDownload
 21-02-2018Appointed Date for Kishangarh Gulabpura Tollway Private Limited.Download
 15-02-2018Update regarding Financial Closure achieved by Kishangarh Gulabpura Tollway Private LimitedDownload
 02-02-2018Board Meeting on February 7, 2018Download
 25-01-2018Closure of Trading Window - January 29, 2018Download
 06-12-2017Rejoinder to our Disclosure made todayDownload
 06-12-2017Uploaded Transcript of Conference call held on December 6, 2017Download
 08-11-2017Board Meeting on November 8, 2017Download
 06-11-2017Appointed Date for CG Tollway Private LimitedDownload
 30-10-2017Closure of Trading Window – Oct 30, 2017Download
 09-10-2017Update on Credit RatingDownload
 28-09-2017InvIT Committee Meeting held on September 28, 2017Download
 11-09-2017Update on Kaithal Rajasthan Border BOT ProjectDownload
 04-09-2017Appointed Date for Udaipur Tollway Private LimitedDownload
 31-08-2017InvIT Committee Meeting held on August 31, 2017Download
 23-08-2017Proceedings of 19th Annual General MeetingDownload
 24-07-2017Board Meeting on July 24, 2017Download
 13-07-2017Closure of Trading Window – July 13, 2017Download
 30-05-2017Closure of Trading Window – May 20, 2017Download
 30-05-2017Board Meeting on May 30, 2017Download
 30-05-2017Outcome – Joint Managing DirectorDownload
 30-05-2017Outcome – Shifting of Registered OfficeDownload
 04-05-2017Addendum Advertisement w.r.t. IRB InvIT Fund appeared on May 4, 2017Download
 02-05-2017Advertisement for transfer of Equity Shares to IEPF Suspense AccountDownload
 02-05-2017IRB InvIT Fund – Anchor Allocation IntimationDownload
 24-04-2017Advertisement w.r.t. IRB InvIT Fund appeared on April 24, 2017Download
 20-04-2017Filing of Offer Document for IRB InvIT FundDownload
2016-1730-03-2017Outcome of Board meeting – 30-03-2017Download
 18-03-2017Update regarding M.V.R. Infrastructure And Tollways Pvt. Ltd.Download
 17-02-2017Updates on Subsidiary CompanyDownload
 25-01-2017Board meeting on January 25, 2017Download
 13-01-2017Closure of Trading Window – Jan 13, 2017Download
 05-01-2017Update – Average Gross Daily Toll Revenue (October 2016 (before demonetization) v/s. December 2016 (post demonetization)Download
 26-12-2016Letter of Award for Project of Kishangarh to Gulabpura sectionDownload
 21-12-2016Announcement regarding IRB Ahmedabad Vadodara Super Express Tollway Pvt. Ltd.Download
 19-12-2016Announcement regarding IRB Goa Tollway Pvt. Ltd.Download
 12-12-2016Update regarding execution of Concession AgreementDownload
 09-12-2016Announcement regarding Project of Kishangarh to Gulabpura sectionDownload
 01-12-2016Intimation under Regulation 30 of SEBI (LODR) Regulations, 2015Download
 22-11-2016Board meeting on November 22, 2016Download
 04-11-2016Closure of Trading Window – Nov 04, 2016Download
 07-10-2016Update regarding Mumbai Pune Phase II ProjectDownload
 30-09-2016Letter of Award for Kishangarh – Udaipur – Ahmedabad HighwayDownload
 26-09-2016Letter of Award for Udaipur Rajasthan / Gujarat BorderDownload
 23-09-2016Proceedings of 18th Annual General MeetingDownload
 20-09-2016Announcement regarding Project on Kishangarh – Udaipur – Ahmedabad HighwayDownload
 07-09-2016Intimation of filing of Draft offer document of IRB InvIT FundDownload
 11-08-2016Board meeting on August 11, 2016Download
 11-08-2016Outcome of Board meeting held on August 11, 2016Download
 03-08-2016Announcement regarding Agra Etawah ProjectDownload
 01-08-2016Resignation of DirectorDownload
 25-07-2016Closure of Trading Window – Jul 25, 2016Download
 22-06-2016Financial Closure of Agra Etawah ProjectDownload
 19-05-2016Newspaper advertisement – Audited Financial results FY 2015-16- May 19, 2016Download
 12-05-2016Board meeting on May 19, 2016Download
 08-05-2016Outcome of Board meeting held on May 19, 2016Download
 03-05-2016Closure of Trading Window – May 03, 2016Download
2015-1629-03-2016Resignation of DirectorDownload
 16-03-2016Announcement regarding IRB InvIT FundDownload
 09-03-2016Board meeting on March 9, 2016Download
 01-03-2016Update on Zozila Project – Mar 01, 2016Download
 22-01-2016Board meeting on January 29, 2016Download
 03-01-2016Letter of Award for Zozila ProjectDownload
 07-12-2015Announcement regarding Ahmedabad Vadodara ProjectDownload