The Concessionaire shall receive semi-annual annuity from the NHAI during this operation period and shall also receive Operation & Maintenance payment for the maintenance of the project highway. 40% of the Project cost would be funded by NHAI during the construction period.
VM7EPL was entrusted to construct an eight lane 27.50 Km section of Expressway between Vadodara and Mumbai in Gujarat on a Hybrid Annuity Mode (HAM) basis.
The Gandeva β Ena Project comprises the section of Vadodara Mumbai Expressway from km 190.00 to km 217.500 (Phase-I Package-VII).

The Project Features
Corridor Description
The proposed Main Expressway passes through the states of Maharashtra, Gujarat and Union territory of Dadra & Nagar Haveli. The total length of the proposed expressway is about 379 km and runs generally parallel to the existing NH-8.
The Package I of the Expressway starts from Km 355+000 and ends at Km 378.740 (Km 80 of NE-1) near Vadodara. It passes through Vadodara district in the state of Gujarat
The alignment of this package passes mainly through plain cultivated and barren areas. These districts are rich in industrial production. There are many industrial estates and factories in these states both in public and private sectors. Textiles, chemical, petroleum and petro-chemical, paper & pulp, diamond, are located in state of Gujarat.
The MumbaiβAhmedabad Corridor in the western part of the country is one of the important and densest transport corridors of the country which connects financial capital Mumbai to Ahmedabad business city of Gujarat.